From mold design to RIM casting machines β full in-house capability. Aluminum molds in 2β3 weeks, steel molds in 4β6 weeks. Mold ownership transfers to you. Complete turnkey solutions.
Full in-house mold design, fabrication & trial β no outsourcing
CNC machining, EDM, wire cutting, polishing β all done in our Jiangsu facility. No outsourcing delays, full quality control.
Aluminum molds in 2β3 weeks. Steel molds in 4β6 weeks. Rush service available for prototype molds in 10 days.
DFM analysis, mold flow simulation, cooling channel optimization. We review your part design and suggest improvements before cutting metal.
Mold belongs to you. We store it free for 2 years, then ship to your facility. No licensing fees, no restrictions on production location.
CNC tolerance Β±0.05mm. Mirror polishing Ra0.2 available. Multi-cavity molds for high-volume production runs.
We also supply RIM casting machines (20Lβ200L tank capacity), mixing heads, and full production line setup consulting.
Real molds and RIM equipment from HongFox β no stock photos
Drone fuselage, 2-week lead time
High-volume production, 100,000+ shots
5-axis CNC, Β±0.05mm tolerance
First-article inspection included
200L tank, PLC controlled, CE certified
4-cavity, high-volume production
Detailed specs for mold materials, machining tolerance, and RIM machine parameters
| Parameter | Aluminum Mold | Steel Mold |
|---|---|---|
| Mold Material | 7075-T6 Aluminum | P20 / H13 Steel |
| Lead Time | 2β3 weeks | 4β6 weeks |
| Lifespan | 1,000β5,000 shots | 100,000+ shots |
| Machining Tolerance | Β±0.05mm | Β±0.02mm |
| Surface Finish | Ra0.4β0.8 | Ra0.2β0.4 (mirror) |
| Cooling Channels | Integrated water lines | Optimized flow simulation |
| Price Range | $3,000β$15,000 | $15,000β$80,000 |
| Model | Tank Capacity | Output | Use Case |
|---|---|---|---|
| HF-RIM20 | 20L Γ2 | 5β10 kg/min | Prototyping, small parts |
| HF-RIM80 | 80L Γ2 | 15β30 kg/min | Mid-volume production |
| HF-RIM200 | 200L Γ2 | 30β60 kg/min | High-volume, large parts |
From your CAD file to first-article approval in as little as 18 days
Choose the right mold for your production volume
Aluminum
2β3 weeks Β· 1,000β5,000 shots Β· $3,000β$15,000
Best for: Prototyping, pilot runs, design validation
Steel (P20)
4β6 weeks Β· 50,000+ shots Β· $15,000β$50,000
Best for: Serial production, annual contracts
Steel (H13)
5β7 weeks Β· 100,000+ shots Β· $30,000β$80,000
Best for: High-volume, abrasive formulations
2β8 Cavities
6β8 weeks Β· 2xβ8x output Β· Quote on request
Best for: Small parts, high-volume needs
Complete production line solutions β from 20L pilot to 200L industrial
Quick answers to the questions we hear most about molds & equipment
For runs under 5,000 pcs, aluminum (7075-T6) is the cost-effective choice β 60% cheaper than steel, 2β3 weeks lead time. For 10,000+ pcs or abrasive formulations, steel (P20/H13) pays off long-term with 100,000+ shot lifespan.
You do. Mold ownership transfers to you upon project completion. We store it free for 2 years, then can ship to your facility. No licensing fees, no restrictions on where you produce.
Yes. Rush aluminum molds in 10 days (vs standard 2β3 weeks) for an additional 30% expedite fee. We run 24/7 shifts and prioritize your job. Steel rush molds in 3β4 weeks (+40% fee).
Yes. We supply HF-RIM20 (20L), HF-RIM80 (80L), and HF-RIM200 (200L) machines. Includes installation, training, and 1-year warranty. CE certified. We also provide raw material supply agreements.
Wall thickness analysis, draft angle check, parting line recommendation, gate location, potential sink/void prediction, and mold flow simulation. We deliver a 3β5 page report with specific recommendations within 3 working days.
Molds are packed in custom wooden crates with anti-rust coating and desiccant. Shipped via sea freight (30β45 days) or air freight (5β7 days). We handle all export documentation, insurance, and customs paperwork.
Yes. Mutual NDAs before any design exchange. Mold designs are your intellectual property β we never reuse, replicate, or share them. We can also sign IP protection agreements for long-term partnerships.
Send your part files for DFM review. Quote within 24 hours. Mold ownership transfers to you.
Request Quote β